Glossary of electric industry, energy & cooperative terms R R-Factor R-Valve Rafter Ratchet Rate Base Rate Design The revenue requirement estimates the amount of revenues needed over a specific period of time to cover operating expenses, taxes, debt service, fixed interest expense, and a reasonable return for investor-owned utilities or contribution to the city for municipally owned utilities. Generally, the revenue requirement is forecast for a "future test year." Rate design is subject to changing goals and fluctuating energy and financial conditions. The primary function of rate design is to recover the revenue requirement. Rates can also be used to achieve other desired aims – be they those of a utility or the Public Service Commission (PSC). In the 1950s and early 1960s, rates were designed to promote increased consumption of electricity for, in those days, the costs of supplying energy decreased as usage increased. Since the early 1970s, however, this trend has been reversed. Rates are now designed to encourage efficient use of resources. The cost allocation and rate base portions of any rate case proceeding are frequently the most controversial, subject to extensive review by the PSC staff and rate case intervenors. Moreover, state and federal legislators have taken an aggressive role in utility rate design issues. Rate of Return In setting an authorized rate of return, regulators attempt to strike a balance between the interest of the investor and the interests of the ratepayer. The rate of return must be high enough to equal the firm’s cost of capital – so that the firm can maintain its credit rating and attract additional investors – but not so high as to be unfair to ratepayers. The concept of a fair rate of return, then, represents a delicate balance. In rate cases, estimates of the rate of return on rate base are often calculated as weighted averages of the cost of capital; the cost of long-term debt; the cost of preferred stock, and the cost of, or return on, common stock equity. It is important to remember that the rate of return authorized by a regulatory commission is not guaranteed to the utility; the utility must earn that figure to the best of its ability. The earned rate of return can vary from the authorized rate of return for a variety of reasons. Interest rate fluctuations, inflation, attrition and other economic conditions, as well as the management of the firm, can all affect the return finally earned by the utility. Rate Schedule, Tariff Rate Structure When determining rate structures, utilities, commissions and lawmakers must consider such issues as the costs of providing service to customers; the history, development and level of existing rates, the laws that require certain types of rate structures; and conservation goals and attitudes. Ratemaking Authority Reactor Refrigerant Regional Transmission Group Regulation The concept of public utility regulation emerged in 1877 with the U.S. Supreme Court’s landmark Munn V. Illinois decision. With this decision, the Court affirmed the State of Illinois’ right to enforce maximum-price legislation for business whose operations were critical to the community as a whole – That is, attributed with a significant public interest. Public utility regulation via state commissions developed more slowly. In fact, it was not until 1907, when Wisconsin and New York each created its own regulatory commission, that the first state commissions were established. By 1920, nearly two-thirds of the states had created regulatory commissions for public utilities, although most had only limited power and jurisdiction. Before World War 1, most cities felt regulation to be unnecessary, since competition was thought to keep prices down. As a result, several electric companies were allowed to operate in the same city. In most cases, however, this did not result in healthy competition and lower rates, but rather in the strongest companies taking over the more inefficient ones. Today the Florida Public Service Commission, among its duties, regulates the rates of investor-owned utilities in Florida and oversees rate structures for municipal and cooperative utilities. In addition, the Federal Energy Regulatory Commission, formerly the Federal Power Commission, controls the wholesale rates at which electricity is sold to other utilities for resale. Another major government agency that regulates some Florida electric utilities is the Nuclear Regulatory Commission. In addition, the Securities and Exchange Commission (SEC) has significant regulatory influence over investor-owned utilities. Because stock is publicly offered, certain SEC reporting requirements must be met. The SEC sets forth rules specifying the content and format of such reports and prescribes the manner of accounting for certain financial transactions. Under SEC regulations, investor-owned utilities must file an annual report and also the 8-K, 10-K and 10-Q reports. Cooperatives that have loans with the Rural Electrification Administration or the Cooperative Finance Corporation are required by those organizations to provide numerous financial reports (for example, Form 7). The reports include balance sheets, operating statements, statistical data, debt service ration and other data that indicate financial conditions. Reliability Generation system reliability is calculated on both a short-and long-range basis. Short-range reliability is measured as the total existing generating capacity of the system, plus firm purchase agreements, minus loss due to scheduled maintenance or known restrictions. The difference between system demand and generation capacity is the reserve margin. Short-term system reliability is the responsibility of the system operator; it is usually planned on one year’s operation. Long-range reliability is the responsibility of the system generation planning group. An important responsibility of this group is to consider the timing and characteristics of new3 power plant additions required to maintain long-range reliability standards. The long-range standard for generation reliability is "one day in 10 years" loss of load probability; that is only one day in 10 years will load not be met due to insufficient generation capability. The generation planner attempts to maintain a minimum percent reserve margin to account for maintenance and scheduled outages. From a reliability standpoint, the electric distribution system cannot give consumers any more continuous service that it receives from the transmission system. It can only contribute additional outages. Minimizing distribution outages is a product of automatic devices, system operator or dispatcher control, and computer modeling. Computers are used to compile data on power consumption so that load growth, load levels and voltage can be modeled. This allows upgrading the system slightly ahead of growth. System operators or dispatchers monitor the moment-to-moment fluctuations in the distribution and transmission system. They can isolate faults by opening and closing switches and circuits. In addition, the system is constructed to serve customers by lines coming from more than one direction. Therefore, if one line should fail, power is available from another direction. Automatic relaying, circuit reclosers and other protective devices are installed throughout the distribution system to clear faults, provide backup protection and minimize losses of services. The transmission system is the backbone of the energy supply grid. Since transmission lines carry large quantities of power, their reliability is enhanced by the construction of alternate routes or backup for power supply delivery. Renewable Resources Residential Class Reserve Margin (Operating) Residential Residual Fuel Oil Resistance Heating (Strip Heating) Restructuring Retail Retail Competition Retail Market Retail Wheeling Retrofit Revenue Ridge Board Ridge Vent Rigid Insulation Board Roof Louver Roof Sheathing Rural Electric Cooperative Currently in the U.S. there are 60 power generation and transmission cooperatives supplying electricity to distribution cooperatives. There are 16 rural electric distribution cooperatives in Florida served by two generation and transmission cooperatives. Rural Electrification Administration (REA), now the Rural Utilities Service, (RUS) The Rural Electrification Administration was created by Executive order of President Franklin D. Roosevelt in 1935. In l936 Congress passed the Rural Electrification Act to establish a loan program to finance qualified entities willing to provide electric services to rural areas. The Pace Act in 1944 indefinitely extended REA as a lending agency and established a fixed rate of interest (two percent) on a fixed payment schedule (maximum 35 years). Since 1950 all loan contracts have contained "area coverage" agreements requiring the borrower to serve all customers within its area, no matter how sparsely settled. The direct loan program was replaced in 1973 by two loan programs – the Rural Electric and Telephone Revolving Fund, primarily for use by distribution cooperatives, and a guaranteed loan program, primarily for generation and transmission cooperatives (commonly called G&Ts). The Revolving Fund’s "insured" loans carry a standard interest rate of five percent. The REA administrator requires most borrowers to seek supplemental funds, customarily 30 percent, from private, non-government sources. G&Ts use the guaranteed loan program, obtaining money from the private money market at essentially market rates, but with the guarantee of the federal government. Almost all of these non-REA loans have been channeled through the Federal Finance Bank (FFB). The FFB was established in 1973 to bring order to the government’s entry into money markets. FFB facilitates the pooling of the loan needs of government lending agencies and scheduling of federal borrowing to optimize economic arrangements. G&Ts borrow from the FFB at the cost of money to the Treasury plus a handling fee of one-eighth of one percent. Additionally, in 1969 the National Rural Utilities Cooperative Finance Corporation was organized to provide supplemental financing for cooperatives from private, non-government sources. Rural Electrification Act Page last updated: Friday, March 5, 2010 |
|||||||||||||||||||||||
|
Lake (352) 357-5600; (352) 429-2195 • Marion (352) 237-4107; (352) 489-4390 • Levy (352) 528-3644 • Sumter (352) 793-3801To report outages only •1-800-732-6141 | Terms | Contacts | Webmaster | Site Map © 1996-2010 Sumter Electric Cooperative, Inc. -- dba SECO Energy. All rights reserved. Do not use text or graphics without written permission. |