Non-renewable Generation & Renewable Generation less than 1,000kW

SECO is committed to helping our environmentally conscious customers by providing the means to interconnect customer-owned renewable generation systems to SECO’s power grid.

SECO has developed interconnection guidelines to insure:

  • safe operations of member systems
  • safety of its employees
  • member generation does not adversely impact the reliability of the power grid

Getting Started...

To get started follow the steps below to complete the required forms and return, with original signatures, to SECO. Our Engineering Services Department will contact you after your forms are received.SECO Member Generation Check List

Required Forms:

Interconnection Checklist

Interconnection Agreement & Application

Contact SECO’s Engineering Services Department at
352-793-3801 or send an email to customergeneration@secoenergy.com if you need
assistance with completion of the forms.

Quick Links:

Florida Solar Energy Center

U.S. Federal Tax Rebate

PV Watts Solar Calculator

IEEE Standards

Non-renewable Generation & Renewable Generation over 1,000kW

Contact SECO’s Engineering Services Department at 352-793-3801 or customergeneration@secoenergy.com to obtain Facility Connection Requirements or to submit an official interconnection request.

Back to top

SECO™ • 330 South Hwy 301, Sumterville, FL 33585-0301 • Citrus (352) 726-3944 •  Hernando (352) 521-5788  • Pasco (352) 521-5788
Lake (352) 357-5600; (352) 429-2195 • Marion (352) 237-4107; (352) 489-4390 • Levy (352) 528-3644 • Sumter (352) 793-3801
To report outages ONLY •1-800-732-6141 
| Terms | Contacts | Webmaster | Site Map
© 1996-2012 Sumter Electric Cooperative, Inc. -- dba SECO Energy. All rights reserved. Do not use text or graphics without written permission.

Page last updated: Monday, January 23, 2012